Moeller PS3, PS306 and PS316: back up the program and replace the controller
These controllers are the older generation from Klöckner Moeller. They were programmed with DOS software; suitable computers and cables are hardly available any more. This is exactly what becomes a problem in the event of a fault.
The risk
Many PS3 and PS316 plants run without problems until a module fails. Then there is no spare part, no program and nobody who can still operate the software. The result is long, unplanned downtime.
Our solution
- We have the equipment for the old software, read the program out of PS3, PS306 and PS316 controllers and decompile it into a readable form.
- We convert ladder diagram programs (LAD) into a structured, readable form.
- We replace coupled controllers, e.g. several PS3 linked via Suconet K, with a single modern PLC.
- For small plants, a Siemens S7-1200 with a few expansion modules is often sufficient.

Other Moeller systems
Moeller PS4
PS4-141, PS4-151, PS4-201, PS4-341: programming, replacement and retrofit.
Learn moreMoeller PS416
Modular PLC with Sucosoft S40: troubleshooting, memory cards, migration.
Learn moreMoeller PS24
Replace rack-based systems, e.g. with Siemens S7-1500.
Learn moreProgram read-out and decompiling
PS24, PS3, PS4, PS306, PS316, PS416: we retrieve the program from the PLC and make it readable again.
Learn moreBreakdowns and spare parts
Plant down, module faulty: fast help and interim solutions.
Learn moreOperator panels MI4, VTP2, Galileo
Replace old Moeller panels with modern Siemens or Beckhoff panels.
Learn moreFrequently asked questions
Which software was used to program the PS3, PS306 and PS316?
They were programmed with DOS-based versions of Sucosoft. These only run on old hardware or in specially set-up environments. We have both.
Is a repair still worthwhile for such old controllers?
As a bridging solution yes, in the long term rarely. We recommend backing up the program now and planning the retrofit before a failure determines the timing.
We have two PS3 connected via Suconet K. Can they be combined in one controller?
Yes, that is a typical case. Both programs are merged and implemented on a single new PLC.
Which controller runs your plant?
Send us the type, year of manufacture and a photo of the control cabinet. You will get an honest assessment of whether repair, data backup or a retrofit makes sense.